

High Stakes and High Expectations
When Constructive Management prepared for a major overhaul of a prominent London office block, they faced a complex compliance hurdle. Situated in the shadow of St Paul’s Cathedral, the building presented a unique set of logistical and historical challenges:
- Live Environment: The building housed multiple high-end tenants operating across global time zones, requiring a “zero-disruption” approach to decorative finishes.
- Incomplete Data: While the site underwent significant refurbishment in the 1990s, the historical asbestos removal records were fragmented and unreliable.
- Access Constraints: Coordination required precision timing to ensure surveyors could access secure areas without impacting international business operations.
The ADEX Solution: A Pragmatic, Solutions Focused Approach
Constructive Management has long partnered with ADEX, relying on our reactivity and professionalism. To tackle this specific project, we implemented a bespoke strategy designed to bridge the gap between rigorous compliance and operational continuity.
- Strategic Scheduling: We deployed teams across varied shift patterns to align with the building’s global occupancy schedule.
- Specialist Collaboration: By integrating with specialist trades, we ensured that the invasive nature of a Refurbishment Survey was managed with surgical precision, leaving high-end finishes intact.
- Data Reconstruction: Our team meticulously cross-referenced the incomplete 1990s records with fresh onsite findings to create a comprehensive, modern data set.
The Result: Zero Risk, On Schedule
ADEX delivered a fully compliant Refurbishment Asbestos Survey that met every regulatory requirement while respecting the premium nature of the workspace.
By providing a sensible and pragmatic roadmap, we cleared the path for Constructive Management to begin their project on time, with the peace of mind that all asbestos risks were identified, documented, and managed.
“ADEX continues to be our first choice because of their ability to find solutions where others see obstacles. Their professionalism in high-pressure environments is second to none.”
— Constructive Management

